FAIR in action: 5 pilots

The experiences of the FAIR beneficiaries demonstrate good practices in asset management in the flooding domain, in five pilot projects. The pilot projects provide a proof of concept, which validates the application of the FAIR framework.

This validation has shown that the use of the framework can help to ensure that:

  • flood protection assets are designed and used to be as multi-functional as possible,
  • there can readily be reduced life cycle costs of at least 5%, and a typical prolongation of the lifespan of targeted infrastructure by at least 5%.
NSR 5 pilots

Map of the 5 pilots in the NORTH SEA REGION