FAIR in action: 5 pilots
The experiences of the FAIR beneficiaries demonstrate good practices in asset management in the flooding domain, in five pilot projects. The pilot projects provide a proof of concept, which validates the application of the FAIR framework.
This validation has shown that the use of the framework can help to ensure that:
- flood protection assets are designed and used to be as multi-functional as possible,
- there can readily be reduced life cycle costs of at least 5%, and a typical prolongation of the lifespan of targeted infrastructure by at least 5%.

Map of the 5 pilots in the NORTH SEA REGION